![](https://covahaywards.com/wp-content/uploads/2019/10/burnieloader-straightened.jpg)
Project Scope
The first of our major shiploader designs dating back to 1995. COVA designed and managed the construction of a woodchip receival and stockpiling system and a reclaim and out loading facility. Chips were received from trucks positioned on elevating tipper units and reclaimed by dozer into pits under the stockpile.
Schedule
Completion: 1995